A machined part that arrives marked is a reject, however well it was made. Packing is specified as part of the job rather than left to whoever is closest to the bench at dispatch. Finished faces and critical bores are protected individually, parts are separated so they cannot rub against each other in transit, threads and spigots are capped or sleeved, and heavier items are secured so the load cannot shift and load a feature that was never meant to carry weight.
Consignments are labelled and itemised so your goods inwards can check the delivery against the purchase order without unwrapping everything. Where a batch is inspected before dispatch, the report travels with the consignment as well as by email, so the paperwork does not arrive separately from the parts.
On lead time, treat manufacture and transit as two separate numbers. Our standard lead time is 2 to 3 weeks on planned work, measured to dispatch, with simpler turned or laser cut items often faster and complex machined or welded assemblies longer. Transit time then sits on top of that: as a general guide air freight runs about one to two days and sea freight about four to six. Freight is not included in the price unless the quote says so, consignments we book are insured, and we can deliver direct to a mine site, an installer or another third party rather than only to your own address. Asking us for a dispatch date and adding your own carrier's transit gives you a schedule you can rely on, and if a delivery date is genuinely fixed, tell us the date at enquiry stage rather than at order stage.